Archive for May 19th, 2020

Educational Resources – Floods

May 19th, 2020

Calgary Emergency Management Agency (CEMA) and the Water Utility have joined forces to produce some educational and information resources on FLOODS.

PreparingForFloodSeason 2020

 

CP Construction Begins: Elbow Bridge Twinning. PATHWAY CLOSURE MAY 19!

May 19th, 2020

Canadian Pacific Rail has notified The City about starting their Elbow River bridge twinning construction on May 19.

The City will need to close the east Elbow River pathway under the CP tracks.

  • Pathway detour options include 4 St SE and 11/12 St SE.
  • Pathway detour maps will be posted near the closure and online at calgary.ca.

In the meantime, you may have noticed the adaptive roadway set-up on 11/12 St SE beneath the CP bridge. This will be the only link to walk or wheel between Inglewood or Ramsay for some time. Do send your feedback about the adaptive roadway and your interest in 11/12 St SE to 311 and your Councillor’s office.

For more information on Canadian Pacific’s rail bridge project,