Archive for August, 2020

RCA GENERAL Meeting – Tues Sept 01, 7 pm

August 31st, 2020

Hello All

Hope you had a great summer.

Please join us for the RCA General meeting Tues. Sept 01, 2020 @ 7 pm

Meeting will be held virtually, please see our  RCA EVENTS page

 

Inglewood/Ramsay City Projects Update – August 2020

August 25th, 2020

 

Inglewood/Ramsay City Projects Update – 

August 2020

 

See below for important updates on upcoming construction and projects in the Inglewood and Ramsay communities.

Airport Vicinity Protection Area Proposed Changes – Project Update

We are working with the Calgary Airport Authority, to bring forward proposed amendments to the Noise Exposure Forecast (NEF) contour areas within the Calgary International Airport Vicinity Protection Area (AVPA) Regulation for Council’s consideration.

The NEF contours have not been reviewed or updated since 1979. Aviation regulations and technologies have changed and advanced since then. Modernized NEF contour mapping has been developed to reflect the changes to aviation regulations and technologies. These changes will preserve the operations of the Calgary International Airport and enable land use potential in some communities.

 

The proposed amendments will be presented to the Standing Policy Committee on Planning and Urban Development on September 2. If Council approves the resolution to request a Ministerial amendment to the AVPA Regulations, Administration will send the proposed amendments to the Province for consideration. No changes will be made to the AVPA Regulation or the NEF contours unless they are approved by the Province.

For more information about the proposed amendments, please visit calgary.ca/AVPA.

9 Avenue S.E. Bridge Replacement – Construction Update

It’s been a busy summer construction season for the 9 Avenue S.E. bridge replacement project, with site preparations well underway for installation of the new bridge.

Construction progress

Over the past several months, crews have been focused on completing required work in the area surrounding the bridge, to prepare the site for installation of the new structure. This work includes road and sidewalk demolition, new stormwater infrastructure and other underground utility works east and west of the new bridge. Construction of concrete approach slabs is underway and the roadway will soon start to be reconstructed. See photos below of (1) concrete pump truck onsite for west approach slab pour and (2) finishing concrete on the roadway deck section.

Behind the scenes

In addition to construction on-site, work continues behind the scenes on the production of steel beams and concrete sidewalk planks. These components will be used for the installation of the new bridge, which is expected to start later in September.

For more information and updates on the project, please visit calgary.ca/9ave.

Inglewood/Ramsay Social Recreation Needs – Engagement ending soon

Community Engagement opportunity is closing on Aug. 31. We want to hear from you!

Great communities are built on opportunities to connect and get active. We have begun a process to understand how Calgarians who live, work, and play in Inglewood and Ramsay use social and recreational spaces. We need your input to help us make decisions that reflect your needs.

The City of Calgary is working to determine the long-term futures of the Beltline & Inglewood Recreation facilities, through a thorough understanding of the social & recreational needs of those communities. This process will take place throughout 2020 and 2021 in three phases:

 

  • Discover, in which we’ll seek to understand the social & recreational needs and opportunities of the two communities through several methods including market research, community engagement and consultation with external service providers to identify service gaps and overlaps.
  • Design, in which we’ll evaluate the results of the feedback in the Discover phase to develop recommendations for services or amenities in the community.
  • Deliver, in which we’ll move forward on Council’s direction regarding investments and actions to meet community need and address the long-term future of the facilities.

Help us understand what’s important to you

As we work through the Discover phase, we need the input of your community on how you stay healthy, connected and active. Online engagement is open at www.calgary.ca/inglewoodrec until Aug. 31, 2020. We encourage you to participate in this online survey and make sure your voice is heard.

While you’re there, make sure you apply to receive a Neighbourhood Inquiry Kit, which helps us understand how local residents are meeting their social and recreational needs.

For more information, please visit calgary.ca/inglewoodrec.

Stay connected on City projects in your community

Feel free to forward this newsletter to your neighbours and friends in your community. Residents can sign up here for these email updates to receive monthly news about City projects in the Inglewood and Ramsay communities.

UPDATED – Aug 18: 11 Street /12 Street S.E. Route Improvements – Project Update

August 18th, 2020

11 Street /12 Street S.E. Route Improvements – Project Update from City of Calgary

from City of Calgary – Transportation Infrastructure

The City of Calgary is making changes to 11 Street and 12 Street S.E. - between 9 Avenue and 26 Avenue S.E. to improve the connectivity, access and mobility for people who travel through Ramsay to connect to the Inglewood community.

To address the gap in our sidewalk network along this corridor. We anticipate construction to begin in September 2020 and will be complete by the end of October. All construction is weather dependent, and every effort will be taken to minimize disruption to residents and businesses during construction.

Construction plans:

  • Installing a new asphalt sidewalk and wheelchair ramps on the east side of 11 Street between 17 Avenue to 19 Avenue S.E.
  • Adding a pedestrian crossing across 12 street at 11 avenue SE with overhead pedestrian flasher to improve this connection for people wheeling and walking.
  • Installing a new asphalt sidewalk and wheelchair ramps along the west side of 11 Street between 21 Avenue and 26 Avenue S.E., including a new pedestrian crossing for the CP Rail tracks.
  • Putting in a new southbound bus pad on the west side of 11 Street just south of 23 Avenue S.E.
  • Adding a wheelchair ramp on the southwest corner of 10 Avenue and 12 Street S.E. This wheelchair ramp will be smaller than typical to ensure the nearby tree will not be removed.

A map showing the locations where construction will occur is attached.

During construction, we will temporarily close one vehicle travel lane along 11/12 Street S.E. to complete the work; however, traffic will still be maintained through the area and no truck detours will be required as a result of this work. Business access and transit routes will be maintained.  Although some sidewalks will be closed during construction, alternative pedestrian accommodation will be provided.

When this project is complete, people who travel through Ramsay to connect to the Inglewood community will benefit from improvements in connectivity, access and mobility along the corridor. There will be new connections to local businesses and key destinations such as the Crossroads Market, the Bow River and the 9 Avenue Main Street area.

People walking, wheeling and driving along the corridor can stay up-to-date on construction activities on calgary.ca/12st or they can subscribe to receive email updates.

Feel free to share this information as you feel appropriate. If you require more information about the upcoming construction work, feel free to contact me.

Kind regards,

Michael(Mike) Keith, P.Eng.  PMP

Transportation Engineer
The City of Calgary – Transportation Infrastructure

3rd Floor, Rocky Mountain Plaza – 615Macleod Trail SE

P.O. Box 2100, Station M, Calgary, AB T2P 2M5 │Mail Code: 8481

N/A  |  587.227.4455  |  F 403.268.4799
calgary.ca

 

Ramsay Construction Map – Aug 2020

 

Ramsay Constr Map - Aug 2020

 

Ramsay Strikes Back!

August 17th, 2020

As many of you know, RamsayRink and Skate shack were recently hit by with vandalism.

I am happy to say that our community members and volunteers de-graffiti’d and improved the security@ Rink and Shack.

SHOUT OUT TO:

Kevin Watkins and the amazing painting team for their donation of Time and Product, to wipe away all traces of graffiti on the RamsayRink and Skate Shack.   What a generous gesture, and amazing transformation.

Eric Malzer, community volunteer and journeyman electrician, who came out to help paint the graffiti and identified opportunities to improve our exterior lighting to help deter future occurrences of vandalism.  Eric generously donated his time and expertise to troubleshoot, replace and repair the exterior lights on the skate shack soffit and the rink roof, as well as some required safety repairs.

 

On behalf of the Ramsay Community Association, and the Ramsay community. T H A N K  Y O U!  

Just two of a plethora of Ramsay volunteers. Working hard to make Ramsay the Best Community in Calgary.

#RamsayStrikesBack

 

Vince Bodnar
President
Ramsay Community Association
unnamed (3)

VANDALS STRIKE RAMSAYRINK

August 16th, 2020

VANDALS Struck the RamsayRink and Skate Shack on Saturday Aug 15

Anyone see anything, please contact Calgary Police Service and 3-11 (SR Number: 20-00715315)

Looks like we need to organize a few Painting Parties.

☹️

 

Please email if you are to coordinate and volunteer.

AC240DAD-036B-4854-8385-502082081349

Thank you

Regards,
~Vince Bodnar
President
Ramsay Community Association
Ramsay Community Association

2102 Ramsay Street SE
Calgary T2G 4S2

AGM Volunteers NEEDED

August 14th, 2020

Hello Ramsay Friends

In the year of “Covid” we have had to make a lot of adjustments in our lives.

As we live in this New Normal, we need to change the way the Ramsay Community Association operates and well.

We moved our General and committee meetings online, and they have been going well.

This fall we will need to move our Annual General meeting online as well.

As the event is a bit more technical, we are reaching out to our membership for assistance.

AGM-Blog-Thumb

 

Details:

Short Term project – ends Oct 2020

Deliverables:

  • meeting platform
  • e-voting and motions system
  • meeting management – moderator, poll management, Chat management
  • tech. support
  • phone / email reception support
  • membership and voting management
  • meeting registrations

If this sounds like an awesome task that you’d like to assist with please contact me via email.

 

THANKS

Vince Bodnar

President
Ramsay Community Association
 
Ramsay Community Association

2102 Ramsay Street SE
Calgary T2G 4S2

 

 

 

 

 

STILL RECRUITING VOLUNTEERS – Committee and Board Volunteers

August 14th, 2020

The Ramsay Community Association is STILL RECRUITING  for Board Committee Positions for 2020-2021.

Get Involved!  

volunteer

The Following Community Association Board Positions will be elected at the 2020 Annual General Meeting (AGM):

  • Vice President External (1 year Term (Year 2 of a 2 year Term)
  • Vice President Internal  (2 year Term)
  • Secretary (2 year Term)
  • Directors at Large
    • (2 year Term)
    • (1 year Term)
    • (1 Year Term)

Any Ramsay Community Association member who wishes to be considered by the nominating committee for one or more of the above positions, or to hold a seat on the nominating committee, please email Vince Bodnar (President) president@ramsaycalgary.ca

Nominations made before  Sept 30, 2020 will be considered by the nominating committee.

Nominations will be accepted from the floor at the time of the AGM.

 

Additionally, there are a few Community Association Committees that we are currently seeking volunteers:

    • Nominations Committee (short term)
    • AGM Committee (short term)
    • Recreation Committee (Chair)
    • Safety Committee (Chair)
    • Membership Committee
    • Finance Committee
    • Communications Committee

 

Please contact Vince Bodnar (president): president@ramsaycalgary.ca  TODAY!