As early as August 8, phased utility relocation work will require a full intersection closure at Olympic Way/4 Street S.E. and 11 Avenue S.E. This work will also require the full closures of Olympic Way/4 Street S.E. between 9 and 12 Avenue S.E.; and 11 Avenue between Olympic Way and 5 Street S.E.
This work will be divided into phases. The following closures will be in place across all phases: A full intersection closure of Olympic Way/4 Street S.E. and 11 Avenue; and full road closures of Olympic Way/4 Street S.E. between 9 and 12 Avenue; 11 Avenue between Olympic Way/4 Street S.E. and 5 Street S.E. Future phases will call for a full closure of 12 Avenue between 5 Street S.E. and 6 Street S.E., more information will be provided.
Main north-south pedestrian access maintained on west side of Olympic Way/4 Street S.E.
Detour in place for 12 Avenue cycle track at 3 Street S.E. for duration of Beltline Downtown Utility Relocation Project.
Two-way traffic on 11 Avenue between 3 Street S.E. and Olympic Way/4 Street S.E. Local access only. No thru traffic.
Two-way traffic on 12 Avenue between Olympic Way and 3 Street S.E.
Access to Ramsay via 6 Street S.E. and 12 Avenue. Follow detours.
Opmerkingen